
Middle Rio Grande Water Supply Study
The Middle Rio Grande Water Supply Study was initiated in June 1999 as a joint project of the New Mexico Interstate Stream Commission and the U.S. Army Corps of Engineers. The study was conducted as the first step of a broad regional water planning process, addressing the question, "What is the water supply for the region?" To answer this question, the study quantified the conjunctive groundwater-surface water supply for the region from Cochiti Dam to Elephant Butte Reservoir, considering the constraints of the Rio Grande Compact. An Executive Steering Committee comprised of water resource engineers and scientists, and major stakeholders in the study area provided technical advice and guidance during the project.
Phase 1 of the study identified hydrologic data, reviewed key water budget studies, and developed a Work Plan to quantify the conjunctive use water supply in the Middle Rio Grande region. Phase 2 implemented the Work Plan and culminated in August 2000 with the release of a comprehensive report, available below. Phase 3 of the study will further refine the characterization of the components and processes of the hydrologic budget of the study region and the probabilistic model developed during Phase 2. Important details on Phase 3 of the study will be posted on this page as the study progresses.
Some of the documents below are in .PDF format which require the Adobe Acrobat Reader for you to view. If you do not have the Adobe Acrobat reader, it is available FREE for various platforms, PC, MAC, Unix, etc. To download a copy click the Adobe icon ...

- MRGWSS Phase 3 Final Report
- Executive Summary
- Final Report
- Figures
- Tables
- Appendix A - Metadata Database
- Appendix A - Metadata Files - Spatial Data
- Appendix A - Metadata Files - Time Series
- Appendix B - Summary of Flow Data and Compact-Based Flow Indices
- Appendix C - Summary of Consumptive Use Data
- Appendix D - Probabilistic Analysis of Water Budget Terms
- Appendix E - Groundwater Modeling of Present and Alternative Conditions
- Appendix F - Model Output
- Appendix G - Middle Rio Grande Planning Region Supporting Documents
- Appendix H - Socorro-Sierra Planning Region Supporting Documents
- MRGWSS Phase 3 Project Meetings
- Kickoff Meeting
Link to the meeting minutes for the September 7, 2001 kickoff meeting for Phase 3 of the Middle Rio Grande Water Supply Study. - Progress Meeting - September 27, 2002
Link to the meeting minutes for the September 27, 2002 progress meeting of the Executive Steering Committee for Phase 3 of the Middle Rio Grande Water Supply Study. - Progress Report - October 24, 2003
Web Page Last updated: 01/13/2004 - Progress Reports
Link to periodic progress reports for Phase 3 of the Middle Rio Grande Water Supply Study.- Progress Report 1 - 08/01/01 to 09/08/01
- Progress Report 2 - 09/09/01 to 10/06/01
- Progress Report 3 - 10/07/01 to 11/03/01
- Progress Report 4 - 11/04/01 to 12/01/01
- Progress Report 5 - 12/02/01 to 01/26/02
- Progress Report 6 - 01/26/02 to 02/23/02
- Progress Report 7 - 02/24/02 to 03/23/02
- Progress Report 8 - 03/24/02 to 04/20/02
- Progress Report 9 - 04/21/02 to 05/18/02
- Progress Report 10 - 05/19/02 to 06/15/02
- Progress Report 11 - 06/16/02 to 07/13/02
- Progress Report 12 - 07/14/02 to 08/10/02
- Progress Report 13 - 08/11/02 to 09/07/02
- Progress Report 14 - 09/08/02 to 10/05/02
- Progress Report 15 - 10/06/02 to 11/02/02
- Progress Report 16 - 11/03/02 to 11/30/02
- Progress Report 17 - 12/01/02 to 12/28/02
- Progress Report 18 - 12/29/02 to 01/25/03
- Progress Report 19 - 01/26/03 to 02/22/03
- Summary Progress Report - July 2002 to February 2003
- Progress Report 20 - 02/23/03 to 03/22/03
- Progress Report 21 - 03/23/03 to 04/19/03
- Progress Report 22 - 04/20/03 to 05/17/03
- Progress Report 23 - 05/18/03 to 06/14/03
- Progress Report 24 - 06/15/03 to 07/12/03
- Progress Report 25 - 07/13/03 to 08/09/03
- Progress Report 26 - 08/10/03 to 09/06/03
- Progress Report 27 - 09/07/03 to 10/04/03
- Progress Report 28 - 10/05/03 to 11/01/03
- Progress Report 29 - 11/02/03 to 11/29/03
- Progress Report 30 - 11/30/03 to 01/24/04
- Progress Report 31 - 01/25/04 to 02/21/04
- Progress Report 31 - 01/25/04 to 02/21/04
- Project Technical Memoranda
- New Mexico Climate Memorandum
Link to a technical memorandum analyzing the paleo-climate and climate-forcing information for New Mexico and the resulting implications for probabilistic modeling in the Middle Rio Grande Water Supply Study. - 1950's Drought Analysis Memorandum
Link to a technical memorandum analyzing the severity of the 1950's drought. - Preliminary Analysis of Hydrologic Impacts of Alternatives Proposed by the Socorro-Sierra Regional Water Planning Group
Link to a technical memorandum providing a preliminary hydrologic evaluation of water planning alternatives proposed for the Socorro-Sierra region. - SSPA/SNL Joint Statement
Link to a joint statement by SS Papadopulos and Associates and Sandia National Lab on the similarities and differences of each parties' respective models and the role of the models in the regional water planning process. - Reevaluation of Hydrologic Statistical Distributions
Link to a technical memorandum providing a reevaluation of the probability distribution functions for several of the inflow components of the probabilistic modeling performed during Phase 2 of the Middle Rio Grande Water Supply Study. - MRGWSS Phase 1 and 2 Reports and Documents
- Phase 2 Final Report
Link to the Phase 2 Final Report for the Middle Rio Grande Water Supply Study. Additional information on the results of the study can be found at the website: http://www.sspa.com/ashu/rio/start.htm. - Executive Steering Committee
A list of those invited to participate on the Executive Steering Committee. The Committee was commissioned to ensure that the goals of the study are achieved. - Bibliography
A list of reports reviewed as part of the study.



